Project Schedule
Listed below is a working schedule of the major meetings and milestones for the Multimodal Improvements project:
- December 14, 2009 — Initial Columbia Pike Implementation Team (CPIT) meeting
- Winter 2010 — Started multimodal transportation analysis and environmental documentation
- March 24, 2010 — CPIT Meeting
- Spring 2010 — Draft transportation and environmental existing conditions reports
- Summer 2010 — Preliminary engineering and future transportation condition analysis
- September 22, 2010 — CPIT Meeting
- Fall 2010 — 10% engineering plans
- November 2010 — CPIT meeting
- Winter 2011 — Draft environmental document, draft transportation study report
- April 26, 2011 — CPIT Meeting
- October 25, 2011 — CPIT Meeting
- Early Fall 2011 — Final transportation study report, final environmental document
- Spring 2012 — Public Meeting
- Spring 2012 — 50% engineering design plans