880-ICM project Alan Chow Functional requirements are under development as of November of 2007. These documents are estimated to be finalized in early 2008.
TEMS Alan Chow

This document presents the functional requirements identified by the potential users and stakeholders of the TOS asset management system.  Download PDF

Regional HOT Lanes Lisa Klein Functional Requirements are not available at this time.
Bay Area Video Upgrade (BAVU) Alan Chow The BAVU system will meet all and only the system requirements listed in this document. This document will be updated to reflect any approved changes made to these requirements during the project lifecycle. Download .doc
SFgo Cheryl Liu SFgo Program Central System Software (CSS) Requirements Matrix  Download PDF
SV-ITS West Ken Salvail Concept of Operations Report includes Technical Requirements and Alternatives Download .doc
East Bay Smart Corridors (INTEL) Frank Furger Systems Engineering Study for the East 14th Street, International Blvd,
Telegraph Avenue Bus Rapid Transit project Download PDF

MY 511 (Web Interface)

Jim Macrae

Software Requirements Specification  Download .doc

Real-Time Transit

Jim Macrae

This document presents the system requirements for the Bay Area Regional Real-Time Transit Information System.  These set of the requirements are based on the evaluation criteria developed for the selection of the architecture, discussions with the MTC, the TAC and Telvent Farradyne (TF), and on the existing procedures and features of the existing real-time system.  Download PDF
Transit Trip Planning Software

Thomas Spiekerman

The Request for Qualifications (RFQ) for Transit Trip Planning Software, including Appendix C, Trip Planning Software Functional Needs, that explains the desired features and functions of the new transit trip planning software system. Because the new trip planning software is expected to be incorporated into the RTIS and use data maintained in the Regional Transit Database (RTD), Appendix C also describes the interface and data exchange requirements for the new trip planning software. Download PDF
511 Regional Rideshare Program

Emily van Wagner

Existing system attributes/functions are detailed in this SOP, and it is understood that the system should maintain this functionality unless otherwise approved by MTC.  Download PDF
Interim Center-to-Center System  

 

Jeff Georgevich

This report presents a description of the existing legacy systems that will participate in the Interim Center-to-Center (C2C) System; identifies the functions that are desired by each participating system; and presents a Scope of Work for developing the Interim C2C System.  Download PDF